Wind Farm Repowering

The Challenge
The developer aimed to replace existing wind turbines with the highest possible capacity models. This required determining maximum allowable heights in accordance with potential aeronautical impact, and, if necessary, assessing that impact through a detailed aeronautical safety study.
Our Solution
We analysed the maximum achievable heights, considering aerodrome, radio, and operational obstacle limitation surfaces, as well as the impact on both visual and instrument flight procedures, among other factors.
Benefits
We optimised the investment in compliance with legal limits while ensuring the safety of air operations.



